| 2023 | Gowling WLG | Wood Group | Buncefield Rebuild | Evaluation of under tank cathodic protection systems |
| 2022 | Axiom | ConocoPhillips | Ekofisk Pipeline | CP evaluation (onshore section) |
| Z-Subsea | IOCL | Paradip Terminal | Corrosion implications of repair to 48-inch pipeline |
| 2021 | Stohm BV | Stohm BV | Pipeline end fittings | CP design calculations and methodology |
| 2019 | AIE | Dubai petroleum | Pipeline life extension | Ad hoc CP advice |
| 2018 | DNV-GL | PDO | Pipeline isolation joints (Oman) | Advice on stray current corrosion issues |
| HKA | MTH | Sheringham Shoal wind farm | Cathodic protection design and modelling evaluation |
| | BHGE | Ichthys Project (Australia) | Multiple corrosion issues – subsea and topsides equipment |
| 2017 | Atkins | Nexen | Long Lake Pipeline (Canada) | CP Evaluation for re-use assessment |
| 2016 | Petrofac | Petrofac | FPF-1 | CP evaluation and retrofit calculations – semi-submersible |
| 2015 | AIE (UAE) | Petrofac | (Not disclosed) | Review of CIPS and DCVG data |
| | Dubai Petroleum | Multiple offshore platforms | Selection of CP retrofit parameters |
| | DNO | Bukha export line (onshore) | Review of CP evaluation report |
| Shell | Shell | Pipelines (subsea) | Development of CP assessment guidelines |
| | | Leman Complex | Review of ICCP retrofit design |
| Taqa | Taqa | North Cormorant ICCP retrofit | Subject matter expert |
| Wood Group | BP | Machar W197 infill | CP design review |
| 2014 | AIE (UAE) | Petrofac | Hamriyah offshore condensate line | CP status review 30-inch line |
| | Dubai Petroleum | Loading line | Anode depletion study - SBM |
| Atkins | Talisman Sinopec | Flyndre Cawdor Over Clyde | Corrosion implications of shrouded flange |
| Shell | Shell | Bittern Pipelines | CP review |
| 2013 | AIE (UAE) | DNO | Musandam Offshore Pipeline | CP design review |
| Bechtel | Reliance | Petrochemical complex India | CP design review |
| BP | BP (Egypt) | West Nile Delta | Materials & corrosion Engineer |
| Jacobs | Bae Systems | Barrow Harbour | Review of CP design |
| Petrofac | Petrofac | FPF-1 upgrade | Internal and external CP upgrade designs |
| Shell | Shell | Gannet pipeline | CP Review |
| | | Onshore pipelines | Review of ICCP system management |
| | | Leman complex | Review of ICCP retrofit proposals |
| 2012 | Atkins | Antrim Energy | Fyne | Definition of CP requirements for mixed usage oil/seawater tanks |
| Wayland CC | Sonangol Logistica | Porto-Amboim terminal | CP design review |
| 2011 | Chrysaor | Chrysaor | Solan | CP design for articulated column foundation and oil storage tank
|
| J.P. Kenny | Shell (Ireland) | Corrib pipeline | Review of onshore CP design |
| 2010 | Carisbrooke Shipping | Carisbrook Shipping | MV Greta 'C' | Investigation of rudder corrosion damage due to failed CP bonding |
| Commtech | Ramboll | London Array | Review of CP and Corrosion design - Sub-station |
| Jee Limited | DONG | Onshore pipelines | Review of implications of flooding on CP systems |
| Shell | Shell | Bacton terminal | CP Review |
| | | Leman pipelines and AD 1 Platform | Cathodic protection assessment |
| 2009 | Atkins | BP | Claire Pipeline | Review of corrosion management |
| Commtech | Ramboll | Gwynt Mor Wind farm | Review of CP Design Brief |
| | Fluor | Greater Gabbard | CP specification review |
| J.P. Kenny | Saudi Aramco | Manifa Pipelines | CP design |
| Premier Oil | Premier Oil | Solan | CP design - subsea oil storage tank |
| | Shell | Standards | Contribution to internal CP standard |
| Xodus | Queensland Gas Co | Narrows Crossing FEED | Review of CP design |
| | Pipestream BV | X200 Project | Implications of CP for high strength spiral strip pipe |
| 2008 | BAC | NIOC | South Pars Gas Field | CP calculation review |
| Commtech | Garrad Hassan | Teesside Offshore Wind Farm | CP specification review |
| Genesis | Ithica Enegy | Jacky Development | CP design review |
| Pegasus | Talisman | WaGe Riser | CP Design review |
| Shell | Shell | Anasuria FPSO | Remediation of impressed current CP system |
| VCI Malaysia | VCI (Malaysia) | MOX-Minigan 1800 Project | CP design for stainless steel line |
| Vetco Grey | BP | Skarv Field | Investigation of under-skirt anodes |
| 2007 | Cath-Tech | SonaHess (Algeria) | Gasi El Agreb | Review of stray current corrosion issues |
| LR | Maersk | General | Development of CP design procedure |
| | | Gryphon FPSO | CP retrofit design - external hull |
| | | | CP design: water ballast tanks |
| MCS | Marathon Oil Corp | Alvheim Development | Sub-sea Corrosion management strategy |
| Xodus | BP | Multiple North Sea Installations | Risk assessment - hydrogen cracking due to CP |
| 2006 | Genesis | Oilexco | Brenda & Nicol field development | Pipeline materials selection and CP design Report |
| 2005 | BAC | Veba Oil | Ras Lanuf tank farm | CP design review |
| MACAW | Point Lisas Nitrogen Ltd | Firewater tank | CP design review |
| Pegasus | ExxonMobil | LP6 & Arthur developments | Material selection and CP design tie-in spools |
| Teknica | Sirte Oil (Libya) | El Khoms- Tripoli 34" gas Line | Corrosion implications of delayed construction |
| VerdErg | BP | Foinaven | Umbilical pullhead CP |
| Vetco Grey | Shell Sarawak | Well control systems | Investigation of (alleged) rapid depletion of anodes |
| 2004 | Intec | BP | Schiellalion | CP design for control distribution trunking |
| MACAW | BP | Faragon FEED | Review of pipeline CP designs |
| Pegasus | Venture Production | Kittiwake loading buoy | Retrofit CP design |
| | Talisman | Tweedsmuir | CP design: tie-in spools |
| 2003 | CCS | (not disclosed) | Civil engineering project | CP design review |
| Pegasus | Petreco SARL | Galata Field development | Review of pipeline and platform CP compatibility |
| Talisman | Talisman Energy | Flotta terminal | CP design review for storage tank |
| 2002 | BAC | Veba Oil | Ras Lanuf tank farm | CP system site investigation and report |
| Andrew Palmer & Associates | Iranian Offshore Oil Company | Lavan island loading Lines | CP design |
| | BGI | Atlantic & Cromarty tie-ins | CP design |
| | BP | Unity Platform | Riser CP design |