YearClientEnd-UserProjectActivity
2023Gowling WLGWood GroupBuncefield RebuildEvaluation of under tank cathodic protection systems
2022AxiomConocoPhillipsEkofisk PipelineCP evaluation (onshore section)
Z-SubseaIOCLParadip TerminalCorrosion implications of repair to 48-inch pipeline
2021Stohm BVStohm BVPipeline end fittingsCP design calculations and methodology
2019AIEDubai petroleumPipeline life extensionAd hoc CP advice
2018DNV-GLPDOPipeline isolation joints (Oman)Advice on stray current corrosion issues
HKAMTHSheringham Shoal wind farmCathodic protection design and modelling evaluation
BHGEIchthys Project (Australia)Multiple corrosion issues – subsea and topsides equipment
2017AtkinsNexenLong Lake Pipeline (Canada)CP Evaluation for re-use assessment
2016PetrofacPetrofacFPF-1CP evaluation and retrofit calculations – semi-submersible
2015AIE (UAE)Petrofac (Not disclosed)Review of CIPS and DCVG data
Dubai Petroleum Multiple offshore platformsSelection of CP retrofit parameters
DNOBukha export line (onshore)Review of CP evaluation report
ShellShellPipelines (subsea)Development of CP assessment guidelines
Leman ComplexReview of ICCP retrofit design
TaqaTaqa North Cormorant ICCP retrofitSubject matter expert
Wood Group BPMachar W197 infillCP design review
2014AIE (UAE)Petrofac Hamriyah offshore condensate lineCP status review 30-inch line
Dubai Petroleum Loading lineAnode depletion study - SBM
AtkinsTalisman SinopecFlyndre Cawdor Over ClydeCorrosion implications of shrouded flange
ShellShellBittern PipelinesCP review
2013AIE (UAE)DNOMusandam Offshore PipelineCP design review
BechtelReliancePetrochemical complex IndiaCP design review
BPBP (Egypt)West Nile DeltaMaterials & corrosion Engineer
Jacobs Bae SystemsBarrow HarbourReview of CP design
PetrofacPetrofacFPF-1 upgradeInternal and external CP upgrade designs
ShellShellGannet pipelineCP Review
Onshore pipelinesReview of ICCP system management
Leman complexReview of ICCP retrofit proposals
2012AtkinsAntrim EnergyFyneDefinition of CP requirements for mixed usage oil/seawater tanks
Wayland CCSonangol Logistica Porto-Amboim terminalCP design review
2011Chrysaor ChrysaorSolanCP design for articulated column foundation and oil storage tank
J.P. KennyShell (Ireland)Corrib pipelineReview of onshore CP design
2010Carisbrooke ShippingCarisbrook ShippingMV Greta 'C'Investigation of rudder corrosion damage due to failed CP bonding
Commtech RambollLondon ArrayReview of CP and Corrosion design - Sub-station
Jee LimitedDONGOnshore pipelinesReview of implications of flooding on CP systems
ShellShellBacton terminalCP Review
Leman pipelines and AD 1 PlatformCathodic protection assessment
2009AtkinsBPClaire PipelineReview of corrosion management
Commtech RambollGwynt Mor Wind farmReview of CP Design Brief
FluorGreater GabbardCP specification review
J.P. KennySaudi AramcoManifa PipelinesCP design
Premier OilPremier OilSolanCP design - subsea oil storage tank
ShellStandardsContribution to internal CP standard
Xodus Queensland Gas CoNarrows Crossing FEEDReview of CP design
Pipestream BVX200 ProjectImplications of CP for high strength spiral strip pipe
2008BAC NIOCSouth Pars Gas FieldCP calculation review
Commtech Garrad HassanTeesside Offshore Wind FarmCP specification review
Genesis Ithica Enegy Jacky DevelopmentCP design review
Pegasus TalismanWaGe RiserCP Design review
ShellShellAnasuria FPSORemediation of impressed current CP system
VCI MalaysiaVCI (Malaysia)MOX-Minigan 1800 ProjectCP design for stainless steel line
Vetco GreyBPSkarv FieldInvestigation of under-skirt anodes
2007Cath-Tech SonaHess (Algeria)Gasi El AgrebReview of stray current corrosion issues
LRMaerskGeneralDevelopment of CP design procedure
Gryphon FPSOCP retrofit design - external hull
CP design: water ballast tanks
MCSMarathon Oil CorpAlvheim DevelopmentSub-sea Corrosion management strategy
Xodus BPMultiple North Sea InstallationsRisk assessment - hydrogen cracking due to CP
2006Genesis OilexcoBrenda & Nicol field developmentPipeline materials selection and CP design Report
2005BAC Veba OilRas Lanuf tank farmCP design review
MACAW Point Lisas Nitrogen LtdFirewater tankCP design review
Pegasus ExxonMobilLP6 & Arthur developmentsMaterial selection and CP design tie-in spools
TeknicaSirte Oil (Libya)El Khoms- Tripoli 34" gas LineCorrosion implications of delayed construction
VerdErg BPFoinavenUmbilical pullhead CP
Vetco GreyShell SarawakWell control systemsInvestigation of (alleged) rapid depletion of anodes
2004Intec BPSchiellalionCP design for control distribution trunking
MACAW BPFaragon FEEDReview of pipeline CP designs
Pegasus Venture ProductionKittiwake loading buoyRetrofit CP design
TalismanTweedsmuirCP design: tie-in spools
2003CCS(not disclosed)Civil engineering projectCP design review
Pegasus Petreco SARLGalata Field developmentReview of pipeline and platform CP compatibility
TalismanTalisman EnergyFlotta terminalCP design review for storage tank
2002BAC Veba OilRas Lanuf tank farmCP system site investigation and report
Andrew Palmer & AssociatesIranian Offshore Oil CompanyLavan island loading LinesCP design
BGIAtlantic & Cromarty tie-insCP design
BPUnity PlatformRiser CP design